trezor.io
Rate this file (Rating : 5 / 5 with 5 votes)
young curly blonde girl wearing a headband in the wind farm with wind turbines
trezor.io

Young Curly Blonde Girl Wearing A Headband In The Wind Farm With Wind Turbines

A forerunner of modern horizontal-axis wind generators was in service at Yalta, USSR in 1931. This was a 100 kW generator on a 30-metre (98 ft) tower, connected to the local 6.3 kV distribution system. It was reported to have an annual capacity factor of 32 per cent, not much different from current wind machines. In the fall of 1941, the first megawatt-class wind turbine was synchronized to a utility grid in Vermont. The Smith-Putnam wind turbine only ran for 1,100 hours before suffering a critical failure. The unit was not repaired because of shortage of materials during the war.
The first utility grid-connected wind turbine to operate in the UK was built by John Brown & Company in 1951 in the Orkney Islands.

File information
Filename:478074.jpg
Album name:Babes
Rating (5 votes):55555
Keywords:#young #curly #blonde #girl #wearing #headband #wind #farm #turbines
Filesize:80 KiB
Date added:May 11, 2012
Dimensions:721 x 1072 pixels
Displayed:324 times
URL:displayimage.php?pid=478074
Favorites:Add to Favorites